01

Drawing set

Every sheet is coded, scaled and issued for construction, so the crew builds from one version of the truth.

Demolition and partitions

  • A-100Demolition plan1:50
  • A-101Partition layout1:50
  • A-102Door and opening schedule1:20

Electrical and plumbing

  • E-200Power and lighting plan1:50
  • E-201Socket and switch schedule1:20
  • P-210Water supply and drainage1:50

Ceiling and floor

  • A-300Reflected ceiling plan1:50
  • A-301Floor finish plan1:50
  • A-302Wet area waterproofing detail1:10

Elevations and joinery

  • A-400Room elevations1:20
  • J-500Joinery sections1:10
  • J-501Kitchen and wardrobe details1:5

Sheets are released as one indexed set per revision. Superseded sheets are withdrawn, not left on site. Open the material schedule

03 / material schedule

Item codes, suppliers, and substitute notes in one decision record

Every line states what was specified, where it goes, the supplier reference, and what happens if the product is discontinued mid-project.

Rev. 04, issued with drawing set A-101 to A-118
Code Item Location Supplier ref Substitute note
M-01 Partition build-up, double layer gypsum board on 50 mm studs Living, bedrooms Knauf W111 / 04821 Equivalent board density only, written approval required
M-02 Porcelain tile 600 x 600 mm, matte Kitchen floor Atlas Concorde / AV-336 Same size and slip class only
M-03 Oak engineered plank 190 mm, brushed Bedrooms, hall Barlinek / 9210 No thickness change without a floor transition review
M-04 Joinery finish, water-based lacquer, RAL 9010 All built-ins Tikkurila / 5051 Sheen may change, colour may not
M-05 Concealed cistern with wall-hung frame Both bathrooms Geberit / 111.335 Frame depth must remain under 120 mm
M-06 Moisture resistant ceiling plasterboard Bathroom, kitchen Knauf / 12009 Moisture class cannot be downgraded

04 / Scope boundaries

What the drawing set does not cover

Even drawings contractors can build from have an edge. These items sit outside the studio scope unless we agree them separately in writing.

If an excluded item becomes necessary, we issue a written variation with scope, fee and schedule impact before work starts. Ask for a scope check.